Q1. ............ is employed for rocky soil earth bed where excavation work is difficult.

Q2. In a long transmission line, if length of line increases, the parameters A and B respectively

Q3. One current transformer (CT) is mounted over a 3-phase 3-core cable with its sheath and armour removed from the portion covered by the CT. An ammeter placed in the CT secondary would measure

Q4. The DC offset in fault current causes conventional over-current (OC) relays to:

Q5. With increase in series reactive loss in a transmission system,

Q6. When the nature of fault in a power system is L-L-G, the three sequence voltages at the point of fault are found to be

Q7. While the dual active bridge converters are used to interface the two Autonomous DC microgrids, the transformer operates at?

Q8. Circuit breakers usually operate under

Q9. The neutral of the power system may be connected to earth

Q10. The function of a breather in a transformer is